1 - Drum Costs
Others

Permanent lenke
http://hdl.handle.net/11250/2500770Utgivelsesdato
2007-10-02Metadata
Vis full innførselSammendrag
Topic: Linear fit
Context:
A developer of oil fields makes extensive use of drums of various sizes and specifications. For project cost estimation they need rough estimates of their costs. As an alternative to looking at detailed specifications and component costs, they will try out the use of simple characteristics of each drum. The simplest possible is just to use their weights. Corresponding costs (in 1000 $) and weights (in tons) for 8 pumps are given in the file Drum_Costs.XLS.
Task:
Establish a relationship between cost and weight and present the result graphically. Suggest a possible use of this relationship in the given context practice.