• Electricity production in a hydro system with a reservoir constraint 

      Mathiesen, Lars; Skaar, Jostein; Sørgard, Lars (2011:03, Working paper, 2011-02)
      The purpose of this article is to analyze how market power may affect the allocation of production between seasons (summer and winter) in a hydro power system with reservoir constraints and inflow uncertainty. We find that ...
    • Grønne sertifikater i et vannkraftbasert elektrisitetsmarked 

      Skjeret, Frode André (Arbeidsnotat, Working paper, 2009-12)
      Dette arbeidsnotatet ser på effekter av å innføre et marked for grønne sertifikater i det norske elektrisitetsmarkedet, et marked nesten utelukkende basert på vannkraft. Vi viser at innføring av grønne sertifikater i Norge ...
    • Investment in transmission 

      Førsund, Finn R. (Working paper, Working paper, 2007-11)
      Transmission is an integral part of the electricity system. However, even within a centralised system of generation and transmission it has never been a trivial exercise to perform coordination of expanding loads, generation ...
    • Wind power, network congestion and hydro resource utilisation in the Norwegian power market 

      Førsund, Finn R.; Singh, Balbir; Jensen, Trond; Larsen, Cato (Working paper, Working paper, 2007-11)
      Capacity constraints in electricity networks can have important impacts on utilisation of new renewable energy capacity and incumbent generation resources. Neglect of such impacts in development of renewable energy resources ...